Electricity Connection




Getting an electricity connection in Delhi has become easier since application forms and other necessary details are available online. The connection can be availed either through BSES or Tata Power.

The connection of electricity in Delhi can be pertained through-

  • BSES
  • Rajdhani
  • Yamuna
  • Tata Power

How to get a New Connection From BSES Delhi

  • As in any procedure, the first step to get an electricity connection is to fill up an application form and then, submit it along with required documents.
  • The application form can be downloaded by clicking the below link:  www.bsesdelhi.com/downloads/NC_BRPL.pdf.
  • The applicant has to place a request for new connection with BSES Delhi. This can be done by visiting the sub divisional or divisional office near the applicant’s residence. All they have to do is to fill a new connection requisition form.

A Photocopy of the Following Documents Should be Attached with the Application Form

  • Voter ID
  • Sale or Ownership Agreement
  • Ration Card
  • Passport
  • Recent Monthly Receipt of the Registered Society where the applicant resides.
  • One or two Passport Size photographs of the applicant.
  • No Objection Document from the owner of the house if the Applicant is a Tenant.
  • Allotment or Possession Letter of the housing society where the applicant resides.
  • If the applicant is co-owner of any asset, he needs to present a NOC from the other co-owner.

The Procedure Followed After The Submission of the Form

Once the application form is submitted to BSES Delhi, the applicant receives an acknowledgement receipt. It contains information such as the submission date of the application and also allots an Application Unique Number.

Once the application is accepted, an Electric Engineer is sent to the residence of the applicant to verify the details mentioned in the form and also, if there is any existing dues or a load connection. The acceptance or rejection of the application depends on this report. If the engineer’s report is positive, the application is accepted and thereby, the applicant has to submit a specified amount at the BSES office.

In addition, a government registered electric contractor should verify the test report and mention the connected load details of electric equipments present at the applicant’s premises.

Following the fulfilment of all procedures after the submission of application form, the new connection gets activated within a span of seven days.

Tata Power

To get an electricity connection from Tata Power, one has to fill an application form and submit it along with required documents. Below is a format of the application form which is available on the website, the link to which is mentioned below.